CITE Services was engaged to complete the bay 1 hazardous area Electrical fit out. Set up as a paint and blast we worked in with GPA to prepare the zone drawings and specification for Zone 1. We installed Hi bay lighting, Exit and emergencies and Power all installed to Zone 1 requirements. We closed the project out with the preparation and hand over of the site HA Dossier.